MULTI-PART AND MULTI-REFERENCE ASSEMBLY INSTALLATION

This type of parts could be made in individual workstations with very high cycle times

Demanding cycle time.

Automatic assembly for 3 parts.

Automatic assembly for 3 references.

Automatic dispensing of each of the parts.

Automatic pressing.

Manipulation between stations by two robots.

Automatic grease dispensing.

Automatic leakage study.

Extraction of OK / NOK parts.